Reading overs correctly
An over has six balls, and 12.3 means 12 overs and 3 balls, not twelve and three tenths. Before dividing, the calculator converts overs to balls: 12.3 overs is 12 × 6 + 3 = 75 balls, or 12.5 overs as a true decimal.
The formulas
Run rate = runs ÷ overs
Required rate = runs needed ÷ overs left
Net run rate = runs scored ÷ overs faced − runs conceded ÷ overs bowled
Worked example
87 runs from 12.3 overs is 87 ÷ 12.5 = 6.96 runs an over. Chasing 160 in 20 overs, the batting side needs 73 more from 45 balls, a required rate of 73 ÷ 7.5 = 9.73. At the current rate they would finish on about 139.
Net run rate in a tournament
Net run rate is worked out across all of a team's matches: total runs scored divided by total overs faced, minus total runs conceded divided by total overs bowled. Under the usual playing conditions, a side that is bowled out is treated as having faced its full allocation of overs, so enter the full quota in that case.
Rain-affected matches use revised targets set by the officials, which this calculator does not work out. Check your competition's playing conditions for the exact rules.